Operational Services - Report: January 28, 2008
Published by Cecilia MacDonald [CeciliaMacDonald] on 01/31/2008 (3731 reads)
Operational Services - Report: January 28, 2008

Superintendent's Report - Operational Services - Maintenance - January 28, 2008



Operational Services Report

January 2008

St. Mary's Relocation to Florence

The relocation of students and staff of St. Mary's Elementary to Florence Elementary will take place the first week of February. The "old wing" of Florence has been upgraded to accommodate the St. Mary's population. Florence Elementary looks very good and is now ready for the relocation thanks to the staff, students and parent community of Florence Elementary for their assistance in hosting those from St. Mary's. Principal David MacDonald and staff have been very hospitable throughout this entire process. Thanks also to Operations staff for all the great work at the Florence site in preparation for this move.

New Schools Status Report

A. North Sydney Elementary

Background

North Sydney Elementary is scheduled for opening in September 2009. This report is to provide an update on

activities which have been taken.

a. Site Selection

The school is to be constructed on the site of the current St. Mary's School in North Sydney, Additional properties have been acquired to accommodate the larger structure. The agreement to purchase the property from St. Joseph's parish requires and agreement to allow the tennis club to continue.

The size of the site and the continued presence of the tennis courts are presenting some challenges with traffic, play space, etc.

b. Design Development to Date

North Sydney Elementary is being designed for 280 students.

On December 5, 2007 the architect and NSDOE provided preliminary floor plans to the SST. These plans were embargoed pending production of the conceptual designs.

The conceptual drawings for the North Sydney Elementary were presented to the SST January 3, 2008.

The conceptual plans have been distributed to the Student Services Coordinators to provide opportunity for comment. A meeting attended by Jim MacEachern (Sports Animator), Mary Lou Andrea (Active Health Living Consultation), Cathy Viva(Coordinator of Student Services), Suzanne Brown (Student Services), Cathy MacNeil (Arts Education) and Donna Robson (English Language Arts Consultant) was held on January 10, to obtain comment from staff.

On January 13, a meeting was held with the SST. In this meeting, the SST comments, as well as comments from board staff, were consolidated. A letter to NSDOE was forwarded January16 to submit the comments.

Future Work

Further work is being completed to provide more detail regarding Learning Support. This will be submitted as soon as complete. Additional work is also being completed to detail staffing for parking, staff room size, etc.

The next round of consultations is expected early in February. At this point the architect and DOE staff will deal with board staff on the details of each space. That is, they will meet with the Music teachers and Cathy MacNeil to discuss the layout of the Music room and with the Physical Education instructors and Mary Lou Andrea to discuss the gymnasium and so on for each space throughout the school.

B. Glace Bay Jr High

Background

Glace Bay Jr. High is scheduled for opening in September 2009. This report is to provide an update on activities which have taken place over the past number of months.

a. Site Selection

The final location for the school has yet to be announced. A report on site selection was presented to the board and the decision to add the KOC property on Wallace Road was approved by the board and submitted to NSDOE for their consideration

A drilling program is underway on the KOC site. Final site selection is expected upon completion of this geotechnical investigation.

b. Design Development to Date

Glace Bay Jr. High is being designed for student population of 650 students.

On December 5, 2007 the architect and NSDOE provided preliminary floor plans to the SST. These plans were embargoeppending production of the conceptual designs.

The conceptual drawings for Glace Bay Jr. High were presented to the SST January 2, 2008.

This concept plan was presented by the project architect and was representative of the Department of Education and representative of the Department of Transportation and Infrastructure Renewal. The conceptual plans include two potential sites.

The conceptual plans have been distributed to the Student Services Coordinators and Senior Staff to provide opportunity for comment. A meeting attended by Jim MacEachern (Sports Animator), Mary Lou Andrea (Active Health Living Consultation), Cathy Viva(Coordinator of Student Services), Suzanne Brown (Student Services), Cathy MacNeil (Arts Education) and Donna Robson (English Language Arts Consultant) was held on January 10, to obtain comment from board staff.

On January 10, a second meeting was held with the SST. In this meeting their comments, along with comments from the board staff, were consolidated. A letter to NSDOE was forwarded January14 to submit the comments.

Future Work

Further work is being completed to provide more detail regarding Learning Support. This will be submitted as soon as complete. Additional work is also being completed to detail staffing for parking, staff room size, etc.

The next round of consultations is expected early in February. At this point the architect and DOE staff will deal with staff on the details of each space. That is, they will meet with the Music teachers and Cathy MacNeil to discuss the layout of the Music room and with the Physical Education instructors and Mary Lou Andrea to discuss the gymnasium and so on for each space throughout the school.

Maintenance Report:

Work Completed or In Progress - November 12, 2007 - January 21, 2008

BUILDING

WORK

COMPLETE/IN PROGRESS

Baddeck

- Spruce up building with extra Cleaners

Complete

Bras D,Or

-New Sidewalk adjacent to Parking Area

Complete

Breton Education Centre

-Install section of new Roof (upper section) - materials reordered-Damaged in windstorm

-Refinish Gym Floor over Christmas for Coal Bowl

Complete

Complete

Bus Garage (Keltic Dr)

- Install Ventilation

Complete

Cabot

- Install new Burner on Boiler

Complete

Central Office

- Renovations for New Office /Staff Room

Complete

Donkin

- New Gym under Construction

97% Complete

Dr. T. L. Sullivan

- Install LCD Projectors

Complete

Etoile De L=Acadie

-Boilers B also, remove two old boilers/Insulation for new Pipes

95% Complete

Florence

Florence (Old Section)

-Painting interior corridor Old Section

-Renovation B Carpentry/Plumbing/Ventilation, etc.

In Progress

Complete

General

- Preventive Maintenance on Ventilation Systems

- Regular Boiler Cleaning

- Replacing Broken Windows

- Checking Water Quality

- Install Door Bells for Security - Various Schools

- Change EMS Controls in Panels

- Wiring Project for Security (Various Schools)

- November Quarterly Sprinkler Inspections

- 2007/08 Fire Alarm Inspections

- Re-keying all entrance Locks and Building with Best Locks on Interior Doors

Ongoing

Ongoing

Ongoing

Ongoing

In Progress

In Progress

In Progress

Complete

In Progress

In Progress

Glace Bay High

- Pricing Lighting for Student Parking Lot - Installing new Light Poles (meeting set with NSP)

In Progress

Holy Angels

- Replace Security System

Complete

John Bernard Croak

- Remove Lockers

In Progress

Jubilee

-Repair controls on A/H unit in cafeteria

Complete

MacLennan Jr. High

-New Ramps Installed

-New Heaters for Gym on order

- Install new PA System with Call Back Buttons

- Security System Upgrade (Door Contacts)

- Install Video Surveillance

Complete

In Progress

85% Complete

85% Complete

Complete

Malcolm Munroe

- Fence Players= Benches

- New Section on Boilers

- Number of locker doors replaced with new doors

- Install new Well Pump

Pending Approval

Complete

Complete

Complete



Memorial High

- Upgrade Training area with new Machines

- Working at Electrical for Vocational Equipment

- Construction of new Learning Centre

-Change out EMS Controls-Install new PA System with Call Back Buttons

-Install LCD Projectors

In Progress

In Progress

Being Planned

CompleteIn Progress

95% Complete

NS Learning Centre

- Replace valve heads on heaters in new section

Complete

Rankin of the Narrows

- Install Parking Lot Lighting B Need ground dug for ground wire

95% Complete

Riverview High

- New Lobby Addition - Phase II Construction

97% Complete

Robin Foote

- Installing New Roof Fans

-Install new PA System with Call Back Buttons

- Security System Upgrade (Door Contacts)

In Progress

85% Complete

85% Complete

Shipyard

- Extension of Chimney Stacks (waiting for materials)

Complete

St. Anne

- Install Floor Mounted Mop Sinks in all Closets

- Spruce up Building with extra Cleaners

-Renovations to Library

-Hook up EMS Controls (on line)

Complete

Complete

In Progress

Complete

Sydney Mines Jr High

-Repair Leaking Tube in Boiler

-Install new Water Line

Complete

Complete

Sydney River Elementary

- New PA System

- New Security System (door contacts)

-Install Video Surveillance

Complete

75% Complete

Complete

Sydney Academy

- Music/Change Room Addition

- New Security System

- Repair Bleachers in Gym

40% Complete

Complete

Complete

TL Sullivan

-New Heaters for Gym and Main Entrance (on order)

In Progress

Thompson

- Security System Upgrade (Door Contacts)

- Install New Ramps off Parking Lot

- Ongoing painting

- Install LCD Projects

- Install new PA System with Call Back Button

85% Complete

Pending Approval

In Progress

Complete

Complete

Whitney Pier Memorial

- Renovations for extra Music Room storage (Needs to be painted)

In Progress


Technology Report :

  • CFS Donated 74 Computers
  • 261 Upgraded Computers
  • Replaced 32 Computers - Sydney Academy
  • Wiring and Rollout Complete - Riverview
  • Server Upgrade - George D. Lewis
  • Computer Clusters (8) - Riverview
  • Computer Clusters (5) - Baddeck
  • Computer Clusters (2) - Malcolm Munroe
  • Computer Clusters (10) - Florence (old section)

Transportation Report :

Report on Additional Training

September 7th , 2007: A half day session was held to review the trip inspections in detail. This included a review of the new Public Utility Board regulations and the inspector went over all sections of the new regulations and had a lengthy period of questions and answers following his presentation.

October 23rd , 2007: A half day session was conducted by the Public Utility Board Inspector and the School Board Safety and Training Officer to review the hours of work reporting procedure under the National Safety Code new regulations. This was more of a review and a discussion and some errors in completing the form that were found. A question and answer session followed.

November 23rd , 2007: Jack Ettinger, a motivational speaker, put on a half day session on how to deal with stress in the work place and how to understand the personalities of the people you work with and develop better communication skills to cope with everyday stress and actions of those around us.

PTM Routing Software and Map Info Mapping Software

During the month of November 2007 Colleen MacMullin, Coordinator of the Transportation Dept, and Kathy Donovan-MacKinnon, Technical Router of the Transportation Dept. , travelled to Charlottetown PEI for a meeting with Pupil Transportation Manager owners/operators. The purpose of the meeting was to discuss the current situation and future of PTM with the CBVRSB. During this meeting the benefits of PTM and MapInfo were discussed. The Transportation of the CBVRSB has benefited greatly since the purchase of the software in 2006. PTM and Mapinfo allow for the databasing and visual analyzing of bus runs for the department. The software programs make it possible to see run overlaps, duplication in stops for schools, regulation violations according to stops and so much more. The Transportation Dept. also uses the software to map student civic locations according to school and map student populations according to board. This mapping allows for analyzing based on walking distances and school catchment areas and helps in new construction location decisions or relocation of students to schools. PTM & MapInfo Software have allowed the CBVRSB Transportation Dept to efficiently and cost effectively run their department by removing unnecessary bus runs and streamlining existing bus runs. These software programs were essential tools when a "Walking Policy Committee" was formed by the Provincial Government under the direction of Chester Sabean. Kathy Donovan-MacKinnon was a member of this provincial committee and used the information input and generated into both programs to help in the decision making processes of the committee and eventual determination of a provincial walking policy within the province of Nova Scotia. The transfer of students from St. Mary's to Florence has been arranged by using busses in the area with the addition of one bus to make the bus runs efficient. All students have been given a copy of their new bus run indicating their stop in the A.M. and P.M. On January 18th , 2007 transportation employees did a morning session at St. Mary's school with Buster the Safety bus delivering our School Bus Safety Program to all students. We expect a smooth transition.